Modern interior reference
E
Excellent Home
Renovations · GTA
Prepared exclusively for this project

A disciplined path
from inspection to completion.

Interior renovation and structural inspection at 5 Eleanor Avenue, York — designed before construction begins, executed with proper preparation beneath every finish.

Client Project
5 Eleanor Ave, York
Scope
Interior Renovation
Investment
$58,000 + HST
Timeline
3–4 weeks
Overview

Project Type

室内翻新及结构检查工程

A complete interior renovation paired with a structural inspection across the basement, main floor, and second floor. Every opening, removal, and restoration is sequenced so the home is left cleaner, stronger, and more livable than before.

01

Scope of Work

施工范围

Door & Window Trim Replacement

1.1

门窗内框及线条更换

  • Remove existing interior door and window trim
  • Supply and install new MDF trim
  • Complete caulking and finishing

Baseboard Replacement

1.2

踢脚线更换

  • Remove all existing baseboards
  • Supply and install new 5" baseboards
  • Caulking and finishing

Basement Plumbing & Electrical Adjustment

1.3

地下室水电整改

  • Modify basement plumbing where required
  • Replace or adjust insulation where necessary
  • Electrical inspection and optimization

Basement Ceiling Inspection & Restoration

1.4

地下室天花检查及恢复

  • Open ceiling in designated areas for inspection
  • Check for structural issues
  • Restore drywall after inspection

Basement Wall Partial Removal & Inspection

1.5

地下室墙体局部拆除检查

  • Remove approximately 18–24 inches of drywall in designated areas for inspection

Stair Repair

1.6

楼梯修复

  • Repair damaged basement stair treads
  • Structural reinforcement and restoration

Second Floor Wall Inspection

1.7

二楼墙体检查

  • Open wall for inspection
  • Check for hidden structural issues
  • Restore drywall after inspection

Main Floor Flooring Replacement

1.8

一楼地面更换

  • Remove existing flooring
  • Supply and install vinyl flooring (approx. 620 sq.ft.)

Main Floor Ceiling Inspection & Restoration

1.9

一楼天花检查及恢复

  • Open approximately 620 sq.ft. of ceiling
  • Inspect for structural issues
  • Perform required repairs
  • Restore drywall after inspection
02

Additional Scope

追加施工项目

Second Floor Bathroom Repair

2.1

二楼卫生间维修

  • Bathroom demolition
  • Replace damaged materials
  • Install new finishes

Main Floor Kitchen Demolition

2.2

一楼厨房拆除

  • Remove existing kitchen
  • Remove backsplash
  • Remove flooring where required

New Kitchen Supply & Installation

2.3

新厨房提供及安装

  • Supply Thermofoil cabinetry
  • Supply quartz countertop
  • Install backsplash
  • Install owner-supplied appliances
Kitchen reference — Thermofoil cabinetry with quartz countertop
Kitchen direction · Thermofoil + quartz
Bathroom reference — clean, modern finishes
Bathroom direction · Second floor
03 · Investment

Project Price

项目总价

$58,000
+ HST · Total project cost
Timeline · 施工周期
3–4 weeks
subject to inspection findings
Payment Schedule · 付款方式
  1. 01Deposit
    10%
  2. 02Start of Project
    30%
  3. 03After Door & Window Completion
    30%
  4. 04After Drywall Completion
    20%
  5. 05Final Payment
    10%
04

The Excellent Home Effect

01

Designed Before Built

Scope and sequencing finalized before a single demo cut.

02

Built Properly

Proper preparation beneath every finish — drywall, base, fastening.

03

Warranty-Backed

3-year workmanship warranty on every line of this proposal.

04

Clear Communication

One organized team from inspection through completion.

05

Important Notes

重要说明

  • Pricing reflects existing visible conditions at time of estimate.
  • Inspection-related openings are restored after structural review.
  • Additional costs may apply if hidden conditions are uncovered.
06

Site Condition Disclaimer

现场条件说明

  • Additional charges may apply if unforeseen site conditions are discovered, including:
  • · Structural damage
  • · Plumbing issues
  • · Electrical deficiencies
Warranty · 保修
3-year workmanship
Insurance
$5M CGL Coverage
Coverage
WSIB Covered
07

Acceptance

签署确认

When you are ready, reserve this project and we will lock the schedule, order long-lead materials, and prepare your start date.